Maitland Hospital, NSW
Project Summary:
Head Contractor:
Installation Contractor:
Scope:
Multiplex where the contractor responsible for the $470m development. On the back of the NSW Healthshare Best Practices study, the product was requested for the development and over 750 EZRcurtainchange units were installed at the new facility.
This was a major step forward for EZRcurtainchange, the product was installed in NSW by an experienced contractor and to over 700 Tracks.
A post construction inspection to iron out some NSW Healthshare enquiries, which should have been avoided if a FREE inspection service offer had been accepted.
The inspection service is offered to contractors to assist with the position of the EZR insert to minimise Track waste and ease of access when changing the curtain as well as the bracing of Tracks and the EZR insert to avoid any movement of the track when changing the curtains or just day to day use of dragging the curtain along the Track girth.
This inspection also identified an issue with the Hooks supplied with the disposable curtains which resulted in a total replacement of the hooks to overcome the issue. The inspection process was provided by EZRcurtainchange at no cost to NSW Heathshare who are responsible for the maintenance and exchange of the curtains.
Our Product Range
Product
Patient Lifter Gate
Product
EZR-IV Trolley
Product
Safety Release Track System
Product
Blox Sustainable Modular Healthcare
Product
EZR IV Tree
